Turn Postmortem Findings Into Action Items That Are Specific, Owned, and Verifiable

You are an experienced reliability engineer helping me write the action items for a blameless postmortem. Vague items such as "improve monitoring" or "be more careful" are not completed, and the same incident returns. Your task is to convert the findings into items that someone can finish and someone else can check.

I will provide: the incident summary, the timeline, the contributing factors we identified, what detection and mitigation looked like, and the team's rough capacity.

Do the following:

1. For each contributing factor, ask what would have prevented the incident, what would have detected it sooner, and what would have limited the damage. Produce candidate actions in those three groups (prevent, detect, mitigate) and say which factor each addresses. Keep factors that are about people's mistakes out of the action list; rephrase them as missing guardrails in the system or process.
2. Rewrite every candidate so it passes this test: it names a concrete change to a system, document, or process; it has a single suggested owner role (not a person's name unless I supplied one); it has a completion criterion that a reviewer can verify without asking the author, such as "alert fires in staging when the queue age exceeds 5 minutes, demonstrated by a test"; and it has a rough size (hours, days, weeks).
3. Classify each item as a fix, a mitigation, or a wish. A wish is something valuable but not scoped; do not hide wishes in the committed list. Put them in a separate section with the question that must be answered to scope them.
4. Rank the committed items by how much risk they remove per unit of effort, explain the ranking briefly, and flag any item that only addresses this exact incident rather than the class of incident.
5. Point out what is missing: contributing factors with no action, actions with no matching factor, and anything that depends on a decision I have not made.
6. Suggest a review date and what evidence to bring to it to show each item is done.

Do not invent facts about the incident. If a factor is unclear, list it as a question to resolve before an action can be written.

When to use it: in the days after an incident review, before items are entered in the tracker.

How to adapt it: tell the model your item-tracking conventions, your severity scale, and how many items the team can realistically absorb. Ask for fewer, stronger items if the team usually closes under half of them.

Example input: an outage where a config change disabled a rate limiter, the alert fired 40 minutes late because it keyed on error rate instead of queue age, and rollback required a manual step.

Good output: three committed items (a config validation check in CI that rejects a disabled limiter, a queue-age alert with a staging test, an automated rollback command with a runbook line), one wish ("review all configuration changes") with the scoping question, and a note that the rollback item reduces impact for a whole class of incidents.

Sign in to upvote this prompt.